Bangladesh BRAC University City Project

At 10:00 am local time on June 18, Seiko International's BRAC University City project steel structure sub-project officially entered the implementation stage, the first section of the steel structure hoisting was successfully completed, from the hook to the installation, the whole process was completed in one go. This project is a milestone project after the Maldives water airport project and another strategic cooperation with Beijing Urban Construction.

(owner and general package inspection component)

(500 tons of crawler cranes are ready for the first lifting operation)

(check the hook)

(in the middle of the transition)


(air traction)

(in place)

The project is located in Dhaka, capital of Bangladesh. It is a modern teaching building for the new campus construction project of BRAC University. The total steel consumption is 15,000 tons. The total project duration is about 2 years. Seiko International is responsible for the steel structure of the project and is responsible for steel structure engineering. Availability and on-site installation.

(Field welding operation)

The BRAC University City project in Bangladesh has the characteristics of heavy tonnage, large section size and thick steel plate. The largest section size is the II-shaped 1340x1800x120 main beam component at the 4-layer position, so the super-thick plate welding technology on the site is proposed. High requirements.